This second phase project, which began in September of 2011, added 144 units and 10 stories (95,000 sq ft) to the existing 229 unit complex in Columbia Heights. Residential units consist of both studio and 1 bedroom spaces with one below grade level and 9 above. Unit finishes include stained concrete floors, granite countertops, and stainless steel appliances.

The exterior façade finishes match Phase I, including an attractive masonry, cast stone and storefront system; the structure is a conventionally reinforced concrete frame. A below grade connection leads to the Phase I parking garage and a two-story above grade walkway connects to the Phase I building. An extensive courtyard including custom fountain, bocce courts, and an outdoor kitchen area were also added between the Phase I and Phase II buildings.

The project was completed in March of 2013, ahead of the scheduled June 2013 completion date.

“What makes McCullough Construction special is that they hold themselves to very high standards in everything that they undertake. They pay very close attention to detail during all phases of a project — and this includes pre-construction planning and post-construction punch-out. Aside from the actual physical construction, the individuals there have the highest level of honesty and integrity. We look forward to working with McCullough on many projects in the future.”

“McCullough Construction, LLC has performed several major renovations for our firm over the past eight years. The majority of these projects included a complete replacement of building mechanical and electrical systems. Their work has been superior, completed within the project schedule and within budget. We would not hesitate to have McCullough Construction work on any future projects and would highly recommend them.”

“McCullough played a key role in transforming a vacant lot into a distinctive Class A Office and Retail project in the heart of historic Annapolis, MD. They successfully addressed the many challenges of the project site and thrived in the urban environment. The City of Annapolis Mayor’s office called several times during the project’s construction to applaud McCullough efforts in minimizing any interference with the public and adjacent businesses. Tom McCullough’s personal involvement from pre-construction through closeout added confidence to the entire project team.”

“McCullough Construction, LLC recently completed a major renovation of our hotel in Washington, DC. The work took place in a fully operational hotel and included the renovation of structural, mechanical and plumbing systems. This project was a “fast track” project and McCullough Construction’s work was on time and under budget.”

Mccullough Construction, L.L.C.
5513 Connecticut Ave., N.W., Suite 200, Washington, D.C. 20015

Office: 202-237-2415 • Fax: 202-237-2416
Office Email: mccinfo@mccullough-construction.com

Privacy Policy